01903 944594
CASE STUDY
A Family Swimming Pool on a Challenging Sloping Site in Bexley, Kent
Bexley, Kent
.png)
PROJECT INVESTMENT
N/A

The project at a glance

LOCATION
Bexley, Kent

POOL SIZE
9m x 3.69m x 1.5m
.png)
CONSTRUCTION TYPE
Pebble Tech Render
.png)
DESIGNER
Vessa Hulme

CONTRACTOR
Everson builders
Customer vision
When David and Vessa decided to build a swimming pool at their home in Bexley, it wasn't simply about adding value to his property.
They wanted to create somewhere their young daughter could grow up making memories. A place to enjoy with family and friends, and something they could all look forward to spending time around for years to come.
Having explored several swimming pool companies, They were drawn to Orbro because of the flexibility we offered. He already had a builder working on a substantial basement project and wanted to retain control over parts of the construction while bringing in specialist swimming pool expertise where it mattered.
Vessa also had a clear idea of how the finished pool should look: elegant, uncluttered and carefully integrated into its surroundings, without unnecessary fittings interrupting the finish.
The Challenge
The swimming pool formed part of a much larger basement excavation on a sloping site.
With the ground falling away, one side of the swimming pool would effectively sit above the surrounding ground level. This made the project very different from a conventional swimming pool excavated into a flat garden.
David's builder had already constructed the retaining wall and excavated the pool area. Orbro installed the drainage sumps before the builder poured the concrete base.
However, when we arrived to construct the pool walls, we discovered the base was approximately 50mm out of level.
The project also took place during the pandemic, when material shortages and disruption across the construction industry created further delays.
Throughout the build, careful coordination between David, his builder and Orbro was essential.
Our Solution
One of the biggest advantages of ClipBlox is how easily it can be adapted to unexpected challenges on site.
When we discovered that the concrete base poured by David's builder was approximately 50mm out of level, it wasn't a major problem.
Because ClipBlox blocks are lightweight polypropylene permanent shuttering, they can be quickly and easily cut to suit the conditions on site.
We simply trimmed the bottom course of blocks to follow the uneven concrete base, creating a perfectly level starting point for the rest of the pool walls.
There was no need to remove and replace the concrete slab or carry out extensive remedial work. Once the first course was adjusted, the remaining ClipBlox blocks could be stacked, clipped together and prepared for the reinforced concrete pour.
It's a great example of how a simple, adaptable construction system can save time and overcome the unexpected challenges that often arise during building projects.
David had chosen a specialist PebbleTec-style finish by Aquastone. We therefore left the perforated face of the ClipBlox shuttering rough following the concrete pour, ready for the finishing contractor's preparation and application.
Orbro installed the swimming pool fittings and constructed the pit for the Paramount automatic safety cover.
We also paid particular attention to the details David didn't want to see.
The lighting cables were extended so the deck boxes could be concealed away from the pool edge. Smaller skimmers were selected, with lids waterjet-cut to blend into the coping stones rather than standing out against the finished surround.
Finally, we installed the swimming pool plant room and heating systems, combining an air-source heat pump with gas heating backup for additional capacity during the colder winter months.
By working alongside David's existing builder, we were able to provide the specialist swimming pool construction and equipment installation without taking over the wider building project.

Finished Results
The finished swimming pool brings together a challenging construction project, carefully considered details and a design centred on family life.
What began as part of a complex basement excavation became a beautifully finished swimming pool, with discreet fittings, flexible heating and an automatic safety cover providing an additional layer of protection when correctly secured.
For David, the ability to use his own contractors while relying on Orbro's specialist experience made the project possible on his terms.
But ask him what makes the pool special, and he doesn't talk about the reinforced concrete shell, the heating equipment or the challenges of construction.
He talks about watching his daughter smile every time she sees it.
Because sometimes the real value of a swimming pool isn't what it adds to a property. It's what it adds to family life.


